Project Description

Client:   Not disclosed
Location:   Melbourne
Surface Area:  
Year Completed:   2021
Medical Supplies Facility Construction and Fit-out

The Challenges

Project: Medical Supplies Facility Construction and Fit-out.

Client Brief:

With the onset of the COVID-19 outbreak, our client required a new production facility fit-out for the manufacture of medical supplies, with Class 7 cleanrooms, temperature controlled rooms and high-density storage capacity within the warehouse.

Scope of Works:

– Class 7 Cleanrooms:

  • Design and construct cleanrooms with HVAC systems to achieve Class 7 filtration.

– Testing Laboratory Fit-out:

  • Conversion of office to testing laboratory.

– Temperature-controlled Production Room:

  • Design and construct large temperature-controlled room housing large production machinery.

– Warehouse Storage Optimisation Design:

  • Designed an optimised layout plan for pallet storage;

– Pallet Racking Supply and Installation:

  • ColbyRack, made in Australia with Australian steel, was supplied as it is superior in terms of strength and could deliver appropriate certification for the unique racking design;
  • A combination of both Selective and Drive-in Racking installed.

– Large Storage Shed:

  • Design and supply of a large shed for bulk storage of palletised supplies.

– Outcomes:

  • Another large project successfully delivered, in quick time to a strict deadline – delivered on time, on brief, …and on budget.